McBreen Environmental successfully delivered a major digestor cleaning and sludge processing project at a wastewater treatment works.
McBreen Environmental were contracted to restore a pump station experiencing groundwater ingress through the joints of its concrete chamber rings.
McBreen Environmental was contracted to restore three 40-metre, 225mm diameter cable ducts.
Our team was tasked with delivering a safe and accurate structural inspection of a culvert that could not be accessed using conventional methods.
Our team was engaged to remove the silt, restore full flow, and protect the surrounding environment.
Our team recently completed a sludge tank management project at a wastewater treatment plant.
An air pigging project to clean approximately 6km of water pipework at a site in Ireland.
Cleaning of eight culverts, approximately 2.7 m in diameter and 60 m in length.
Rehabilitating vital drainage infrastructure in a busy coastal area.
Attenuation ponds play a critical role in controlling flow rates by storing floodwater and releasing it gradually once the risk of flooding subsides.
Our team recently carried out a complete clean of a large pond.
Industrial tank cleaning job completed recently in Co. Sligo by McBreen Environmental.
From CCTV Drain Surveys to drain repairs, we’ve been keeping Irish businesses running smoothly for over 20 years.