No-Dig Cable Duct Rehabilitation at Energy Plant

10 February 2026

McBreen Environmental was contracted to restore three 40-metre, 225mm diameter cable ducts on a major energy infrastructure project.


The ducts had become unserviceable for housing new high-voltage cables, and traditional excavation was not feasible due to restricted access beneath the plant.

Challenges

  • Concrete intrusion from ageing piling

  • Crushed sections within the ducts

  • Open joints creating potential voids

  • Excavation was not possible due to plant layout and operational constraints

Outcome:

The successful rehabilitation of the cable ducts allowed the energy plant to proceed with the installation of new high-voltage cables without the need for disruptive excavation works. By using trenchless rehabilitation techniques, the project avoided major civil works within a highly constrained operational environment.


The restored ducts now provide a structurally sound and fully serviceable pathway for critical electrical infrastructure, ensuring long-term reliability and performance. The project demonstrates how no-dig rehabilitation solutions can effectively extend the life of underground assets while maintaining operational continuity within complex industrial facilities.

Our Solution

Results

The project successfully restored full functionality to all three ducts without disruption to plant operations.


By delivering a safe, efficient, and sustainable solution, McBreen Environmental demonstrated the effectiveness of trenchless technology for complex energy infrastructure challenges.


This project highlights our ability to deliver trusted, no-dig duct rehabilitation solutions where traditional excavation is not feasible.


From initial CCTV surveys to CIPP patching and UV lining, our team provides tailored solutions for critical infrastructure projects, ensuring both safety and long-term performance.

Related Case Studies:

Digestor Cleaning and On-Site Sludge Processing at a Wastewater Treatment Works

McBreen Environmental successfully delivered a major digestor cleaning and sludge processing project at a wastewater treatment works.

View Case Study

Pump Station Rehabilitation Using Hermes Technologie M-Coat System

McBreen Environmental were contracted to restore a pump station experiencing groundwater ingress through the joints of its concrete chamber rings.

View Case Study

150 Metres of Culvert Surveyed Safely with Elios 3 Drone and LiDAR Mapping

Our team was tasked with delivering a safe and accurate structural inspection of a culvert that could not be accessed using conventional methods.

View Case Study

Successful attenuation pond cleaning and relining project

Attenuation ponds play a critical role in controlling flow rates by storing floodwater and releasing it gradually once the risk of flooding subsides.

View Case Study

Share this Case Study:

Have a business emergency?

From CCTV Drain Surveys to drain repairs, we’ve been keeping Irish businesses running smoothly for over 20 years.

bottom of page