525mm UV-Cured Sewer Lining at Casement Road
5 November 2026
Dublin
McBreen Environmental is carrying out the rehabilitation of large-diameter trunk sewers at Casement Road, installing 525mm UV-cured liners within the existing network. Working as a specialist rehabilitation crew, the team has installed 530 metres of UV liner over an eight-day period, a strong rate of productivity given the demanding conditions that come with large-scale sewer rehabilitation. The works restore the long-term integrity of the sewers using trenchless methods, while keeping live wastewater flows running throughout.
Challenges
Installing UV liners within large trunk sewers calls for careful planning, precise execution and strict adherence to quality and safety requirements, all essential to the long-term integrity and performance of the rehabilitated assets. Alongside the complexity of the liner installation itself, the crew had to maintain continuous sewer flows for the full duration of the works, managing fluctuating volumes while avoiding any risk of surcharge or uncontrolled overflow.
Solution:
To maintain the continuity of wastewater flows and minimise the risk of surcharge, a temporary overpumping arrangement was implemented on site. This used both a standard tanker and an articulated tanker to provide the capacity and flexibility needed to manage changing flows while supporting the lining works. Coordinating these resources alongside the UV liner installation added a further layer of complexity, requiring continuous monitoring, effective communication and careful management of site operations throughout.

Results
Despite the technical and logistical demands, the crew continued to make strong progress, balancing the UV lining installation with the requirement to maintain live sewer flows. Installing 530 metres of 525mm liner within eight days represents a considerable achievement, particularly given the added demands of the overpumping operation and the environmental responsibilities involved. It highlights the crew’s technical expertise and efficiency, and their ability to deliver complex rehabilitation works while maintaining strong operational control, service continuity and the prevention of environmental incidents.
Related Case Studies: