Restoring Water Quality with Trenchless Air Pigging

25 September 2025

McBreen Environmental recently completed an air pigging project to clean approximately 6km of water pipework at a site in Ireland.


The network had been experiencing reduced flow and poor water quality due to a gradual buildup of sediment within the pipework.

Objectives

  • Clean 6km of pipework sized 3", 4"and 6"​

  • Restore water quality across the network​

  • Complete cleaning within a 10-day working period

  • Minimise disruption to ongoing site operations

  • Coordinate access to approximately 40 hydrants and 46 sluice valves​

Works Completed:

  • The project involved air pigging and scouring of the pipework using compressed air and water to dislodge and remove sediment and internal deposits.

  • Cleaning was scheduled to target three 200m sections per day, progressing efficiently through the network.

  • Access to approximately 40 hydrants and 46 sluice valves was carefully managed to facilitate smooth operation throughout the works.

  • The trenchless method eliminated the need for excavation, allowing site activities to continue uninterrupted.

Solutions:

Results:

The air pigging operation successfully cleaned approximately 6 kilometres of pipework, removing accumulated sediment and restoring optimal water flow throughout the network.


By using a trenchless cleaning approach, the project was completed within the planned 10-day schedule while minimising disruption to the client’s operations. The process significantly improved water quality across the system and extended the operational lifespan of the pipework.


The successful delivery of this project demonstrates the effectiveness of air pigging as a safe, efficient and non-invasive method for maintaining large water distribution networks.

Related Case Studies:

Digestor Cleaning and On-Site Sludge Processing at a Wastewater Treatment Works

McBreen Environmental successfully delivered a major digestor cleaning and sludge processing project at a wastewater treatment works.

View Case Study

Pump Station Rehabilitation Using Hermes Technologie M-Coat System

McBreen Environmental were contracted to restore a pump station experiencing groundwater ingress through the joints of its concrete chamber rings.

View Case Study

150 Metres of Culvert Surveyed Safely with Elios 3 Drone and LiDAR Mapping

Our team was tasked with delivering a safe and accurate structural inspection of a culvert that could not be accessed using conventional methods.

View Case Study

Successful attenuation pond cleaning and relining project

Attenuation ponds play a critical role in controlling flow rates by storing floodwater and releasing it gradually once the risk of flooding subsides.

View Case Study

Share this Case Study:

Have a business emergency?

From CCTV Drain Surveys to drain repairs, we’ve been keeping Irish businesses running smoothly for over 20 years.

bottom of page