This case study outlines the successful delivery of a large-diameter culvert cleaning project carried out by McBreen Environmental. The works involved the desilting of eight culverts, each approximately 2.7 metres in diameter and 60 metres in length, using advanced robotic cleaning equipment and high-capacity vacuum systems.


The project focused on improving safety in confined space environments, reducing manual labour, and ensuring no structural impact to the existing infrastructure, while meeting tight project timelines and environmental compliance standards.

Scope of Works:

Cleaning of eight culverts, approximately 2.7 m in diameter and 60 m in length, using robotic equipment and vacuum systems, supported by a confined space team.

Objectives:

  • Minimise time and labour required in confined space environments

  • Ensure no structural damage to the existing culverts during desilting

  • Improve safety by reducing reliance on intensive manual labour

  • Shorten overall project duration

Solutions:

Project Delivery:

  • Each barrel contained approximately 800 mm of silt

  • The team achieved 10–15 m of cleaning per day

  • Gerotto operated remotely, with hourly technician rotation

  • Continuous monitoring to avoid structural damage

  • Waste collected in a DISAB Vacuum Unit, transferred to skips, and disposed of at a licensed facility

Related Case Studies:

525mm UV-Cured Sewer Lining at Casement Road

A specialist crew installing 525mm UV-cured liners within large-diameter trunk sewers at Casement Road.

View Case Study

Digestor Cleaning and On-Site Sludge Processing at a Wastewater Treatment Works

McBreen Environmental successfully delivered a major digestor cleaning and sludge processing project at a wastewater treatment works.

View Case Study

Pump Station Rehabilitation Using Hermes Technologie M-Coat System

McBreen Environmental were contracted to restore a pump station experiencing groundwater ingress through the joints of its concrete chamber rings.

View Case Study

150 Metres of Culvert Surveyed Safely with Elios 3 Drone and LiDAR Mapping

Our team was tasked with delivering a safe and accurate structural inspection of a culvert that could not be accessed using conventional methods.

View Case Study

Share this Case Study:

Have a business emergency?

From CCTV Drain Surveys to drain repairs, we’ve been keeping Irish businesses running smoothly for over 20 years.

bottom of page